×

Loading...
Ad by
  • 推荐 OXIO 加拿大高速网络,最低月费仅$40. 使用推荐码 RCR37MB 可获得一个月的免费服务
Ad by
  • 推荐 OXIO 加拿大高速网络,最低月费仅$40. 使用推荐码 RCR37MB 可获得一个月的免费服务

Suggestion, Off set the existing drain to the location wherever you want.

Off set the existing drain to the location wherever you want.
1: Raise the shower stall 3 to 4 inches higher then the basement floor.
2: build a wood frame at the location where the shower stall would be, be sure including the existing floor drain, make the wood frame same size as the bottom of the shower enclosure
3: Install one 90-degree elbow to the existing floor drain, the elbow now is ready for a straight pipe that can run horizontally.
4:Layout all pipe in the wood frame
5:Connect a straight pipe to the elbow and extend the stragiht pipe to the location where the shower would be. Then connect the "U" trap. After the "U" tarp installed. The pipe is now facing up. It is ready for the shower placement
6:After all pipe is done, fill up the raised floor with gravel stone and cement. Put the shower enclosure on top. DONE..
Report

Replies, comments and Discussions:

  • 枫下家园 / 美丽家居 / 各位懂装修的大侠:老公想自己做basement shower,现在发现builder,留出来的出水口位置很偏,怎么挪到我们需要的位置,一定要打开水泥重新接?
    • 要在水泥地上挖沟。
      • 谢谢你的建议。
    • you can run that pipe in the wall.
      • 是地漏那种。
    • Suggestion, Off set the existing drain to the location wherever you want.
      Off set the existing drain to the location wherever you want.
      1: Raise the shower stall 3 to 4 inches higher then the basement floor.
      2: build a wood frame at the location where the shower stall would be, be sure including the existing floor drain, make the wood frame same size as the bottom of the shower enclosure
      3: Install one 90-degree elbow to the existing floor drain, the elbow now is ready for a straight pipe that can run horizontally.
      4:Layout all pipe in the wood frame
      5:Connect a straight pipe to the elbow and extend the stragiht pipe to the location where the shower would be. Then connect the "U" trap. After the "U" tarp installed. The pipe is now facing up. It is ready for the shower placement
      6:After all pipe is done, fill up the raised floor with gravel stone and cement. Put the shower enclosure on top. DONE..
      • 谢谢你的建议,很详细。